The overall project consisted of (4) separate projects. The first project consisted of renovating several floors of the existing Hospital along with site reconstruction at the emergency room entrance and parking lots. The second project consisted of replacing the existing Hospital generators with new fuel powered generators and various architectural renovations to the area surrounding the new generators. The third project consisted of removing and replacing steam tunnel lids and steam piping along with structural repairs to the existing steam tunnel walls. The fourth project consisted of structural repairs and vent pipe replacement of an existing steam tunnel manhole at the emergency ambulance drive.

Project Details

  • Size: 54,964 SF
  • Type: Improvements
  • Delivery Method: General Contractor