Kirksville, MO
Project consisted of removing the old press box, turf field and track at Stokes Stadium on the Truman State Campus and installing new football/soccer synthetic turf field; new track, new long jump, high jump, discus pad and pole vault event areas. Also included was construction of 3,000 square-foot press box with hospitality areas and new ticket booth.