Southeast Missouri State University, Tunnel Repairs Phase III

Cape Girardeau, MO

Project Summary

The project entails demolishing and removing approximately 500 linear feet of concrete tunnel lid to remove the existing mechanical piping and electrical and install new piping and electrical. The replacement tunnel lid will be reinstalled with poured-in-place concrete.

Project Details

  • Size:  500 LF
  • Type: Renovation/Repairs
  • Delivery Method: Design-Bid-Build