Galesburg, IL
Scope included the construction of a flume structure, a non-potable water pump station structure, secondary clarifiers, activated sludge tanks, diversion structures, a return and waste activated sludge pumping station, a blower/electrical building, and a chemical feed building. Also included was bedding, haunching, backfilling, compacting, grading, site work, electrical, controls, paving, surface restoration, and erosion and sediment control.