Back to
Top

Duckett Creek Sanitary District WWTP #4

Wentzville, MO

Project Summary

The project consists of a new 2.5 MGD (peak 6.7 MGD) wastewater treatment facility including, but not limited to an access road, influent structure, influent pump station, headworks building housing screening and grit removal equipment, oxidation ditch, two secondary clarifiers with a flow split structure, UV disinfection building, effluent structure, RAS/WAS and scum pump stations, two aerobic digester tanks, digester building housing blowers and solids thickening equipment, solids dewatering building housing a screw press, odor control systems, plant water and potable water systems, support buildings and associated civil, sitework, site utilities, structural, architectural, mechanical, plumbing and electrical work.

Project Details

  • Size: 2.5 mgd
  • Type: New
  • Delivery Method: General Contractor